Surveying & Engineering for Bridge Replacement – City of Gahanna / Shaw & Holter, Inc. – Gahanna, Ohio

STONE prepared Bridge Construction Plans and provided Surveying / Construction Staking for replacement of a wooden pedestrian bridge spanning Mill Race near Big Walnut Creek. The project is located in a mixed-use area of commercial development and Creekside Park, where you can stroll along the boardwalk to shop, eat, and view the creek. The engineering plans were developed in coordination with the Contractor and adhered to American Association of State Highway Transportation Officials (AASHTO) and City of Gahanna standards and specifications. STONE made efforts to coordinate functionally and aesthetically with an existing boardwalk on the east side and an existing concrete walkway on the west, and completed the steel design in two weeks for this fast-track project.

Related Projects

“We are impressed with the expertise and commitment of STONE. Mary Sharrett is an excellent team player that worked closely with us individually and as a group. She orchestrated the team into a solid, focused, well organized and highly professional group. We are looking forward to a long-term relationship between our organizations.”