Engineering for Bridge Replacement – City of Gahanna – Gahanna, Ohio

STONE prepared Bridge Construction Plans and provided Surveying / Construction Staking for replacement of a wooden pedestrian bridge spanning Mill Race near Big Walnut Creek. The project is located in a mixed-use area of commercial development and Creekside Park, where you can stroll along the boardwalk to shop, eat, and view the creek. The engineering plans were developed in coordination with the Contractor and adhered to American Association of State Highway Transportation Officials (AASHTO) and City of Gahanna standards and specifications. STONE made efforts to coordinate functionally and aesthetically with an existing boardwalk on the east side and an existing concrete walkway on the west, and completed the steel design in two weeks for this fast-track project.

Related Projects

“STONE has provided industrial environmental compliance auditing on several project sites for Amec Foster Wheeler during the last 18 months.  They are very thorough, prompt, and knowledgeable in implementing the work.  Sharon and STONE are focused on customer service, which is refreshing.”