HAM-US22 Ecological/NEPA Services – ODOT – Silverton, Ohio

STONE completed all NEPA Categorical Exclusion (CE) documentation, including a 4(f) determination for the park, ecological survey, regulated materials review (RMR) Screening, cultural resources scoping form, and other CE mapping for this ODOT project. The project included repaving, traffic signal upgrades, and ADA improvements at several intersections. STONE made a “de minimis” determination for a park located with the construction limits, which was determined to be a 4(f) property. Completion of the 4(f) determination required extensive coordination with the park’s Official with Jurisdiction (OWJ).

“Bayshore Environmental is very pleased to have engaged STONE to conduct a Phase II assessment of a contaminated commercial property.  The technical staff at STONE worked with us to develop an excellent program that entailed soil and groundwater sampling, testing and removal of drums of waste petroleum products, and the remediation of contaminated soil.  STONE conducted the work in a timely manner, produced an excellent report that was tailored to meet our needs, and all at a very reasonable cost.  We are pleased to endorse STONE and look forward to working with them in the future.”