Operations Testing – New Lexington, Ohio

For this Ohio manufacturer of brake tubing STONE personnel directed the testing of a catalytic oxidizer. The testing was performed over a three day period when the facility was in full production. STONE prepared a bid package and evaluated proposals from three stack testing firms. After selection of the contractor, STONE coordinated efforts between the company and the stack testing firm so that the production lines were in full operation, records were kept of paint and thinner usage during the testing protocol, and that all air measurements were made by the testing firm. STONE reviewed the results of the testing and prepared a report which was submitted to Ohio EPA to confirm that the catalytic oxidizer was operating as designed and permitted.

Related Projects

“Having worked with STONE on a couple of projects I can say that Mary Sharrett and her staff work diligently to complete projects on time and in a highly professional manner.  They are trusted by state and federal agencies and their experience with permits saves the client time. They are among the best and I look forward to working with them again in the future.”