Operations Testing – New Lexington, Ohio

For this Ohio manufacturer of brake tubing STONE personnel directed the testing of a catalytic oxidizer. The testing was performed over a three day period when the facility was in full production. STONE prepared a bid package and evaluated proposals from three stack testing firms. After selection of the contractor, STONE coordinated efforts between the company and the stack testing firm so that the production lines were in full operation, records were kept of paint and thinner usage during the testing protocol, and that all air measurements were made by the testing firm. STONE reviewed the results of the testing and prepared a report which was submitted to Ohio EPA to confirm that the catalytic oxidizer was operating as designed and permitted.

Related Projects

“STONE is an instrumental part of our team on the Portsmouth By-Pass Project: the 16-mile new construction project, which is the single largest project in ODOT history. This project has come with more than its share of environmental challenges. STONE has delivered over 30 full environmental clearance reviews and reports we have requested as part of the project, handling them from start to finish in a very timely & cost effective manner. Furthermore, they’ve proven themselves as an extremely valuable resource when it comes to consulting on mitigation efforts, hazardous materials, and resolving various unknown environmental situations that the project has encountered.

 

From the top down STONE has proven they are committed to excellence and we look forward to working with them on many projects in the future.”