Ackerman Rd. Resurfacing Design and Bid Preparation – The Ohio State University – Columbus, Ohio

This project included over 1,000 lineal feet of drive replacement to sustain student bus traffic. The pavement was designed based upon one bus per seven minute intervals. The project involved a surface and subsurface drainage design, including new storm sewers and catch basins, as well as design for an ADA accessible pedestrian ramp. A maintenance of traffic plan (MOT) was prepared. STONE prepared construction drawings and bid documents for the project, prepared cost opinion for the work, assisted the university to obtain and evaluate bids, and provided limited on-site services during construction.

Related Projects

“STONE is an instrumental part of our team on the Portsmouth By-Pass Project: the 16-mile new construction project, which is the single largest project in ODOT history. This project has come with more than its share of environmental challenges. STONE has delivered over 30 full environmental clearance reviews and reports we have requested as part of the project, handling them from start to finish in a very timely & cost effective manner. Furthermore, they’ve proven themselves as an extremely valuable resource when it comes to consulting on mitigation efforts, hazardous materials, and resolving various unknown environmental situations that the project has encountered.

 

From the top down STONE has proven they are committed to excellence and we look forward to working with them on many projects in the future.”