Scenic River Erosion and Sediment Control Plan – Union County, Ohio

STONE was asked to quickly develop a construction Erosion and Sediment Control (ESC) Plan for the Collins Road Bridge Rehabilitation project. The Collins Road bridge spans the Big Darby Creek State Scenic River, and impacts to this high-quality stream were a concern. STONE developed one ESC Plan set using AutoCAD Civil3D detailing silt fence and concrete washout best management practices (BMPs) locations. The client requested to have the final ESC Plan delivered within 5 business days, and STONE was able to provide the ESC Plan to the client in 2 business days.

“Bayshore Environmental is very pleased to have engaged STONE to conduct a Phase II assessment of a contaminated commercial property.  The technical staff at STONE worked with us to develop an excellent program that entailed soil and groundwater sampling, testing and removal of drums of waste petroleum products, and the remediation of contaminated soil.  STONE conducted the work in a timely manner, produced an excellent report that was tailored to meet our needs, and all at a very reasonable cost.  We are pleased to endorse STONE and look forward to working with them in the future.”