Spring Valley Stream Restoration – Parks and Recreation Department – Westerville, Ohio

STONE prepared engineering plans for the removal of three deteriorated bridges, abutments, and weirs in this City-owned greenway. The bridges and weirs were constructed in the late 1970s but had received minimal maintenance from the homeowner’s association, who were the owners at the time. In addition to the removals, STONE designed a stop-log outlet structure and discharge line for a storm water retention basin and, in conjunction with an architect, prepared detailed plans for trail/path improvements, new bridge abutments and bridge foundation design, and stream-bank improvement measures. STONE also assisted with geotechnical review for the bridge and on-site construction observation.

“STONE has provided industrial environmental compliance auditing on several project sites for Amec Foster Wheeler during the last 18 months.  They are very thorough, prompt, and knowledgeable in implementing the work.  Sharon and STONE are focused on customer service, which is refreshing.”