MAD-42-24.75 US 42 Expansion – Construction Staking and Stormwater Pollution Protection Plan (SWP3) – BUDS, Inc. – Columbus, Ohio

STONE was contracted to review plans and provide Construction Staking for the contractor for this roadway widening project. Project responsibilities also included STONE’s CPESC-certified Engineers to prepare the Stormwater Pollution Prevention Plan (SWP3), noting that the project is located in the Big Darby Creek Watershed. As part of the SWP3, STONE’s accredited Certified Erosion, Sediment, & Storm Water Inspector (CESSWI) personnel conducted monthly inspections, noted areas that required corrective actions, and updated the SWP3 as needed.

Related Projects

“Bayshore Environmental is very pleased to have engaged STONE to conduct a Phase II assessment of a contaminated commercial property.  The technical staff at STONE worked with us to develop an excellent program that entailed soil and groundwater sampling, testing and removal of drums of waste petroleum products, and the remediation of contaminated soil.  STONE conducted the work in a timely manner, produced an excellent report that was tailored to meet our needs, and all at a very reasonable cost.  We are pleased to endorse STONE and look forward to working with them in the future.”