Topographic and Bathymetric Survey – ODNR Forked Run Dam Rehabilitation – Reedsville, Ohio

STONE performed a Topographic Survey of the project area including a Bathymetric survey of the reservoir area, focusing on the lake drain, spillway and boat launch ramp. Using the topo survey, an existing surface was created showing 1’ contours. STONE also created Existing Conditions sheets following the format provided by the client. By being flexible in the manner in which drawings were provided to the Client, STONE was able to save the Client the time and expense of taking the drawings and converting them to their required format.

“STONE has provided industrial environmental compliance auditing on several project sites for Amec Foster Wheeler during the last 18 months.  They are very thorough, prompt, and knowledgeable in implementing the work.  Sharon and STONE are focused on customer service, which is refreshing.”