Wastewater Sampling & Reporting – Westerville, Ohio
STONE has provided semi-annual industrial wastewater sampling required by the client’s wastewater discharge permit for over three years. The sampling required included four consecutive 24-hour composite samples and four consecutive grab samples. STONE conducted the required sampling within the timeframes specified in the client’s permit and prepared report packages for the client to submit to the City of Columbus including a cover letter, completed self-monitoring discharge report, report certification form, total toxic organics certification form, and laboratory analytical results.