Wastewater Treatment Plant (WWTP) Replacement Feasibility Study, Design, Permitting – New Marshfield, Ohio

This 10-home mobile home park was under orders from Ohio EPA to address the WWTP which was not meeting effluent requirements. The owner’s goal was to replace the conventional activated sludge wastewater package treatment plant with a new onsite treatment system that would not require an National Pollutant Discharge Elimination System (NPDES) permit. STONE developed a feasibility study for the replacement of the wastewater treatment system and designed the septic system, lift station, forcemain, and gravel-less absorption field. STONE worked with the Ohio EPA in evaluating and justifying the design flow and completed design and calculations for the new on-site treatment system.

I just wanted to reach out to both of you & all of Stone for your outstanding effort, due diligence & professionalism on this project.

I’m certainly no ESA expert, but I was blown away by the detail contained in your report, especially given the tight timeframe that was required for delivery.

Please know that your work at Walnut Grove is very much appreciated by everyone here at POAH.

For the record, I am now a huge fan of Stone Environmental, and I hope we will continue our working relationship well into the future.

Doug Dempsey, POAH